Skip to content

USD 10M – 1B project funding

Data centre project finance, from USD 10M to USD 1B

Construction, expansion and refinancing facilities for colocation, edge and hyperscale-leased data centre campuses.

Facility size
USD 10M – 1B
Rates
From 4.5% APR
Upfront fees
None
Security
Secured or unsecured

Subject to underwriting. No product is priced above 12% APR. Any fees are deducted at disbursement.

Data centres are capital-intensive and power-constrained. Lenders look first at the site's power and connectivity, then at the tenant and lease structure that will repay the debt.

Westford Capital Group considers data centre facilities from USD 10 million to USD 1 billion, subject to underwriting. Facilities can be phased so construction draws follow each hall or building, then convert to amortising term debt as leases commence.

What we finance

  • New-build colocation and hyperscale-leased campuses
  • Expansion halls and additional MW of IT load
  • Power infrastructure: substations, generators, UPS and cooling
  • Edge and regional facilities
  • Refinancing construction debt into term debt
  • Fit-out for signed tenants

How facilities are commonly structured

Phased construction-to-term

Draws per phase against certified progress, converting to an amortising term loan on lease commencement.

Lease-backed term debt

Debt sized to contracted lease cash flow, with tenant concentration and renewal terms reviewed in underwriting.

Equipment and power-asset finance

Separate tranches for generators, cooling and electrical plant secured on the assets.

Illustrative example, not a completed transaction

Illustrative: two-phase colocation campus

Structure: Construction facility per phase, converting to term debt. How it works: Phase 2 drawn only after phase 1 leases commence and power for phase 2 is confirmed.

What to prepare

Having these ready usually shortens the review. Missing items can follow later.

0 of 6 ready. Ticks stay on this device only.

Key risks and how they are addressed

Power availability
Phase draws to confirmed power delivery; connection agreements reviewed as conditions precedent.
Tenant concentration
Lease terms, renewal options and tenant credit assessed; pre-let requirements per phase.
Construction overrun
Fixed-price or capped EPC terms, contingency and cost-to-complete tests.
Technology change
Amortisation profile matched to the useful life of each asset class.

Related

Other USD 10M – 1B sectors

US launch states

Never pay anything upfront. Westford never asks for a fee to review a project or release funds. Verify any contact.

Working to a deadline?

These are the time-sensitive situations we see most on this kind of facility. Each one tells you what to send so the desk can assess it properly.

Data centre power or capacity reservation deadlines

A power reservation, interconnection deposit or tenant pre-lease for a data centre has a date attached and the build needs development or construction financing.

What to send

  • Power or interconnection agreement and deposit schedule
  • Pre-lease or LOI from tenants
  • Site control, permits and construction budget
Start an application

A construction or project budget gap before completion

A project needs completion financing, a cost-overrun facility or a mezzanine or private credit tranche to close a funding gap.

What to send

  • Budget, drawdown schedule and cost-to-complete
  • Existing lender consents and intercreditor terms
  • Contracts, permits and offtake supporting repayment
Start an application

Tell us your deadline when you enquire. We can't promise to meet any date: timelines are confirmed in writing once your application is complete. Every facility is subject to underwriting. Rates from 4.5% APR, no product above 12% APR, no upfront fees. All time-sensitive situations · Build a dated plan from your deadline.

Talk it through: book a 15-minute call with a deal officer

Tell us your date and what you need. Choose a preferred time window in your own time zone; the desk confirms the slot by email. No fees, no obligation.

Request a 15-minute call

Frequently asked questions

How much can a data centre project borrow?

Westford considers data centre facilities from USD 10 million to USD 1 billion, subject to underwriting. The amount depends on power, leases, construction cost and sponsor equity.

Do you finance speculative (unleased) builds?

Each request is underwritten case by case. Lenders generally need a credible path to leases; phased draws tied to pre-letting are common.

Are there upfront fees?

No. Westford Capital Group does not charge upfront fees. Any fees are set out in the signed facility documents and deducted at disbursement.

What rates apply?

Indicative rates start from 4.5% APR depending on the product, and no product is priced above 12% APR. Final pricing is set only in a signed term sheet after underwriting.

Is approval guaranteed?

No. Every facility is subject to underwriting, due diligence and a credit decision. Fair credit is welcome and is assessed alongside cash flow, contracts and sponsor strength.

What documents should I prepare?

Usually: power allocation or utility agreement and connection timetable; site control, zoning and permits; signed or advanced leases / letters of intent and tenant profile; construction budget, EPC terms and schedule; financial model with downside cases; sponsor equity commitment and track record. Missing items can follow later.

Ready to finance your next milestone?

Submit a proposal online. A Westford deal officer will be in touch.